Globalgreen International

Projects

Bioplant Energy is seeking to develop its first project in Australia or New Zealand. It is well advanced on a number of projects as detailed in the following.

LavertonLaverton, Victoria, Australia

It is proposed to build a Waste to Energy (WTE) facility on private industrial landin Laverton Victoria Australia.The facility will have six modular GGII twin-furnace pyrolysis lines and be housed in a 6,000 square meters building.

Read more

GeelongGeelong, Victoria, Australia

It is proposed to build a Waste to Energy (WTE) facility on 5Ha of industrial land in Geelong, Victoria Australia.The facility will have six modular GGII twin-furnace pyrolysis lines and be housed in a 6,000 square meters building.

Read more

HokitikaHokitika, South Island, New Zealand

It is proposed to build a Waste to Energy (WTE) facility on 100-hectare of private land at Humphrey Gully Road, Hokitika, South Island, New Zealand. The facility will have one modular GGII twin-furnace pyrolysis line.

Read more

TairawhitiGisborne, New Zealand

It is proposed to build a Waste to Energy (WTE) facility on private land at Tauwhareparae Road, Tolaga Bay, Gisborne District, New Zealand. The facility will have one modular GGII twin-furnace pyrolysis line.

Read more

ManawatuManawatu, New Zealand

It is proposed to build a Waste to Energy (WTE) facility at 247-300 Kawakawa Road Feilding Manawatu District, New Zealand. The facility will have one modular GGII twin-furnace pyrolysis line.

Read more

DandenongVictoria, Australia

It is proposed to build a Waste to Energy (WTE) facility on 1.6-hectares of private industrial land in Dandenong Victoria Australia. The facility will have six modular Bioplant twin-furnace pyrolysis lines and be housed in an 8,000 square meters building (including offices).

Read more

BallaratBallarat, Victoria, Australia

It is proposed to build a Waste to Energy (WTE) facility on 5-hectares of industrial land in Ballarat, Victoria Australia.The facility will have six modular Bioplant twin-furnace pyrolysis lines and be housed in a 6,000 square meters building.

Read more
1 - 7 of 7 projects